How RMAS interface boxes are production tested

This article outlines how RMAS interface boxes are tested before shipping.

Every RMAS interface box follows controlled electrical and communications checks before it is accepted for supply.

Purpose of the test

The production process demonstrates that each interface box is electrically safe, receives the correct supply, and passes radar data and configuration information through the intended ports. The evidence supports National Highways product approval for the MIDAS application.

Controlled equipment and instructions

Reference

Purpose

TWI-176

Controlled test work instruction and fault-finding route

MK343-02

RMAS interface box test box

TE0587

Controlled test equipment reference

PTS-092

Production test software

Acceptance checks

Test

Acceptance intent

HIPOT and electrical safety

Meet the applicable insulation earth and mains safety limits

Power supply

Confirm a correct 24 V output and sound terminations

Loop card data

Confirm that RS485 radar data is present at connector J14

Configuration read and write

Confirm configuration can be written and read through the RJ45 configuration port

Uplink data

Confirm radar data can be read from the uplink RJ45 port

Handling a failure

A failed unit follows the controlled fault-finding checklist in TWI-176. Record the test result, diagnosis and corrective action, then repeat the full required test sequence before the unit is released.

 

Applies to RMAS Interface Box production assurance for the National Highways MIDAS system

Source TAN53 issue 1 27 February 2026